Automatic Transfer Switches

Automatic Transfer Switches

Automatic transfer switches (ATS) move a load between a normal power source and an alternate source, commonly utility power and a generator. Switchgear Builders Texas manufactures new ATS equipment and new retrofit components to project specifications, serving Texas from the United States and shipping nationwide. A useful specification identifies the sources, load characteristics, transfer sequence, transition method, ratings, and control interfaces before equipment is quoted. Configuration, applicable standards, component origin, documentation, and lead time are confirmed during project review.

UL 891 switchboardsMADE IN USAFAST lead times
NEW EQUIPMENT. PROJECT FOCUSED.SERVING TEXAS
Electrical switchgear lineup in an equipment room

NEW SWITCHGEAR FOR YOUR PROJECT

MANUFACTURING / EQUIPMENT / TEXAS

Define the Sources and Transfer Sequence

Start by documenting what the ATS monitors and what it is expected to transfer. Identify the normal and alternate sources, their nominal system characteristics, and whether the alternate source is a generator, a second utility feed, or another approved supply. Clarify which loads are served by the switch and whether the design calls for a service entrance function or coordination with separate upstream equipment. These details shape the switching arrangement and control requirements.

Describe the intended sequence in plain, verifiable terms: what condition initiates transfer, what confirms that the alternate source is acceptable, whether the normal source must remain unavailable for a delay, and what event permits retransfer. State whether retransfer should be automatic or require an operator action, and whether a cool-down period is needed before a generator stops. The sequence should align with the facility’s operating priorities and the generator controls.

Choose an Appropriate Transition Method

Transition type determines how the load moves between sources. Open transition disconnects one source before connecting the other, producing a brief interruption. It is often considered where the load can tolerate that break and the sources should not overlap. Confirm the acceptable interruption duration with the equipment and process owners rather than assuming that all loads respond alike.

Closed transition briefly overlaps sources during transfer, which requires suitable source synchronization and a design that permits the overlap. It can reduce interruption but introduces additional coordination and protection considerations. Delayed transition provides a defined interval with the load disconnected, which may suit loads that need residual voltage to decay before connection to the alternate source. Specify the required method and operating conditions; do not treat transition types as interchangeable.

Size the Switch for the Actual Load

State the required continuous current rating and system voltage as project design parameters, then provide the load schedule and relevant operating conditions for engineering review. Include load type, expected demand, motor starting or other inrush characteristics, and any planned future capacity. The switch must be selected for the circuit and duty it serves; a nominal current value alone does not establish suitability for the installation.

Provide available fault-current information and the protective-device arrangement upstream and downstream. Ask how the proposed ATS configuration coordinates with those devices and whether the application requires a specific withstand or closing performance. Identify conductor and termination constraints, enclosure environment, and installation orientation where known. Final ratings and construction details depend on the approved design and component availability, so confirm them in the quotation rather than relying on an assumed standard configuration.

Coordinate Controller and Generator Interfaces

Document the signals exchanged between the ATS controller and generator controls. Typical interface questions include how a start request is issued, how the ATS recognizes that the generator is ready, and what indication is needed for source availability, transfer position, alarm, or failure. Identify whether interfaces are hardwired or use a specified communications method, and provide control voltage and contact requirements when established by the project design.

Confirm who owns each control function and which system supplies the necessary permissives, status points, and time delays. Generator start, source acceptance, load transfer, retransfer, and engine cool-down should be reviewed together to avoid contradictory settings. If a building management system or remote annunciator is involved, provide its point list and protocol requirements. The final interface schedule should be checked against both the ATS controller and generator documentation.

Plan New Equipment and Retrofit Components

For a new installation, provide the one-line diagram, equipment schedule, applicable specifications, and available enclosure or room constraints. Include the intended relationship to switchboards, distribution equipment, generator output, and any bypass or isolation arrangement required by the project. Switchgear Builders Texas supplies new equipment built to specification using American components as specified; component origin and documentation are confirmed for each quotation, and no independent domestic-content certification is implied.

For an existing installation, requests are limited to new retrofit components. Send the existing equipment manufacturer and model information, photographs of nameplates and relevant interfaces, dimensions, drawings, and a description of the desired change. Retrofit suitability depends on the original assembly, physical fit, electrical characteristics, control compatibility, and available documentation. Do not assume a component will fit or preserve an existing listing without configuration review.

Confirm Standards, Documentation, and Project Scope

Submit the project specification and identify the codes, standards, authority requirements, and documentation applicable to the site. UL 891 is a switchboard standard, not a blanket listing for every ATS or switchgear configuration. Whether an assembly is listed, and which standards apply, must be verified for the exact proposed arrangement. Request the documentation needed for design review, submittals, installation planning, and turnover, and confirm what can be provided with the quoted configuration.

Before requesting pricing, resolve open items such as the transition method, current and voltage requirements, fault-current data, source sequence, interfaces, and retrofit evidence. State the project location in Texas, required ship-to details, submittal schedule, and any delivery constraints; delivery timing must be confirmed for the quotation. Engineering, availability, lead time, component origin, and test documentation are confirmed individually. Installation, servicing, testing, and energization must be performed by qualified personnel using approved procedures.

LET'S BUILD SOMETHING

Start with
the details.

Tell us what you’re working on. The more you can share about your project, the better we can begin the conversation.

PROJECT INQUIRY

Request a quote

This form opens your default email application. Your inquiry is sent only when you send the email. You can also email us directly or call our team.

* Required fields

Request a quote