New Panelboard Equipment

Power Distribution Panelboards

Switchgear Builders Texas manufactures new power distribution panelboards to project specifications and serves customers across Texas from the United States, with shipping available nationwide. Panelboard design starts with the electrical system it must serve: the incoming source, connected loads, feeder arrangement, available fault current and protection upstream. We review project requirements for each quotation, including component choices, engineering scope, applicable standards, documentation and lead time. We also supply new components for retrofit applications.

UL 891 switchboardsMADE IN USAFAST lead times
NEW EQUIPMENT. PROJECT FOCUSED.SERVING TEXAS
Electrical switchgear lineup in a workshop

NEW SWITCHGEAR FOR YOUR PROJECT

MANUFACTURING / EQUIPMENT / TEXAS

Configure Mains, Feeders, and Branch Circuits

A panelboard’s circuit layout should reflect how power enters the assembly and where it must go. Define whether the design calls for a main breaker, main lugs, or another specified incoming arrangement, then identify feeder breakers and branch circuits by destination and required protection. For a useful quote, provide one-line diagrams, panel schedules, circuit descriptions, source details, and any restrictions on breaker positions or future spaces.

Circuit count alone does not settle the configuration. Confirm which loads are continuous, motor-driven, sensitive, or expected to expand, and identify any circuits requiring special switching or protection. The project documents should also state the intended enclosure environment and installation conditions. We use these requirements to review a new panelboard configuration; breaker types, ratings, accessories, and availability are confirmed for the specific quotation.

Balance Loads Across Phases

Load balancing begins with credible circuit information, not simply an even count of branch breakers on each phase. Provide calculated demand, connected load, phase requirements, and operating patterns where known. A designer can then assess phase loading under expected operating conditions and arrange circuits to avoid preventable imbalance, while accounting for loads that vary over time or operate intermittently.

Include relevant load calculations and panel schedules with the equipment request, and flag planned additions or changes that could alter the balance. Where non-linear loads or significant single-phase loads are present, the design team should evaluate their effects using project-specific data. We can build to the specified circuit arrangement, but the engineer of record remains responsible for system load calculations and approval of the design basis.

Establish the Fault-Current Basis

The panelboard’s short-circuit rating must be suitable for the available fault current at its point of installation. That value depends on the source and the distribution path, so provide the calculated available fault current, system voltage, source transformer information when applicable, and relevant conductor or upstream equipment details. Do not select a rating by copying a value from a different location in the system.

The specification should identify the required assembly rating and the basis for it, including whether any specified series-rated combination is part of the engineered design. Verify that the proposed protective devices and upstream equipment support the documented arrangement. Fault-current suitability is configuration-specific; the applicable rating, component compatibility, and supporting documentation should be reviewed and confirmed for each quotation.

Coordinate Protection With Upstream Equipment

A panelboard operates as one part of a distribution system, so its main and branch protection should be considered alongside upstream breakers or fuses. Coordination goals may include selective isolation where feasible, but the result depends on device characteristics, system fault levels, settings, and the actual equipment combination. Provide the upstream protective-device information and any coordination study or design criteria available for review.

When protection settings are adjustable, identify required ranges, trip functions, accessories, and constraints imposed by the system study. Confirm who will prepare or approve coordination and arc-flash analyses, and whether updated calculations are required after equipment selection. We manufacture to specified requirements; the responsible project engineer must validate system coordination and approve protection settings before installation and energization.

Specify Retrofit Scope and Project Documents

For a retrofit, define exactly what will be replaced and what must connect to the existing distribution system. Provide existing panel schedules, one-line diagrams, nameplate information, enclosure and mounting details, termination requirements, and available fault-current data. Photos can help explain field conditions, but they do not replace measurements, drawings, or confirmation by qualified project personnel.

We supply new panelboards and new retrofit components only. The request should distinguish a complete new assembly from replacement components and state which existing interfaces must be retained. Identify shutdown constraints, access limitations, drawing review needs, required submittal contents, and the party responsible for field verification. Installation, servicing, testing, and energization must be carried out by qualified personnel under approved procedures.

Review Ratings, Standards, and Procurement Details

A complete specification should state the system voltage and phase, incoming and outgoing arrangements, required current and fault-current ratings, enclosure requirements, and any project-specific construction details. Include preferred component origin where required and identify documentation needed for review. Component origin, engineering scope, standards applicability, and supporting test documentation must be confirmed for the quoted configuration; do not assume a general statement establishes domestic-content compliance.

Panelboards are not interchangeable with switchboards, and UL 891 is a standard for switchboards rather than a blanket listing for panelboards or all switchgear. Ask which standards and listing requirements apply to the particular assembly and verify them in the submittal. Pricing requests should include the latest drawings, schedules, project location, requested delivery timing, and approval milestones. Lead time is subject to project review and confirmation.

LET'S BUILD SOMETHING

Start with
the details.

Tell us what you’re working on. The more you can share about your project, the better we can begin the conversation.

PROJECT INQUIRY

Request a quote

This form opens your default email application. Your inquiry is sent only when you send the email. You can also email us directly or call our team.

* Required fields

Request a quote