A 120/240-volt switchboard must match the actual supply arrangement, not just the voltage printed on a project schedule. We manufacture new switchboards and new retrofit components to customer specifications for projects in Texas and ship nationwide from the United States. Before requesting pricing, confirm the utility service, phase and wire count, available fault current, load requirements, enclosure conditions, and required standards. Engineering, component origin, lead time, and documentation are reviewed for each quotation.

UL 891 switchboardsMADE IN USAFAST lead times
NEW EQUIPMENT. PROJECT FOCUSED.SERVING TEXAS
Electrical switchgear equipment viewed from the side

NEW SWITCHGEAR FOR YOUR PROJECT

MANUFACTURING / EQUIPMENT / TEXAS

Match the Bus and Devices to the Supply

A common 120/240 V arrangement is single-phase, three-wire: two ungrounded conductors and a neutral, with 120 V available line to neutral and 240 V line to line. The switchboard bus and every protective device must be suitable for the system voltage and the way each circuit is connected. A 240 V circuit may use both ungrounded conductors; a 120 V circuit uses one ungrounded conductor and neutral.

Do not assume a 120/240 V label describes every utility service at a site. Ask the utility or project engineer to confirm phase, wire count, grounding arrangement, and service configuration. Other arrangements, including three-phase services or systems with different voltage relationships, require equipment and device selections suited to those arrangements. Provide the one-line diagram and service information so the proposed assembly can be reviewed against the actual supply.

Choose Pole Configuration by Circuit

Pole count is determined by the circuit and protective scheme, not by voltage alone. For a typical 120/240 V single-phase panel, branch devices may be single-pole for line-to-neutral loads or two-pole for line-to-line loads. Main and feeder device configurations depend on the design, applicable code requirements, and whether the neutral is switched or remains continuous. The engineer of record should identify the intended arrangement on the one-line and schedules.

When specifying devices, identify poles, voltage rating, ampere rating, interrupting rating, and the required trip or fuse characteristics as applicable. Confirm that the device is compatible with the switchboard construction and the available fault current at its point of installation. A replacement device is not interchangeable merely because it fits a space or has a similar handle rating; provide the existing assembly details and approved design criteria for review.

Define Conductor Terminations

Termination details affect the physical layout and whether field conductors can be landed as intended. Specify conductor material, quantity per phase or pole, conductor size range, insulation and temperature assumptions, and whether conductors enter from the top, bottom, or another defined direction. Include the service and feeder cable or bus connection method, lug requirements, and any space constraints imposed by the room or existing equipment.

For retrofit components, identify the original switchboard manufacturer and model when known, along with section dimensions, device catalog information, connection style, and clear photographs or drawings. New retrofit components must be designed for the documented assembly and application; field fit should not be inferred from appearance alone. Confirm access, bending space, barriers, and termination orientation with the project team before release, especially where existing raceways or conductors limit changes.

Specify the Neutral and Grounding Arrangement

A three-wire 120/240 V service uses a neutral for line-to-neutral loads, so the neutral bus and its terminations must be coordinated with the load schedule and service design. State whether a full-size neutral is required or whether a different engineered sizing basis applies, and identify the number and size of neutral conductors. The grounding and bonding arrangement must follow the approved one-line and applicable project requirements.

Clarify whether the switchboard is service equipment or downstream distribution equipment. That distinction affects where neutral-to-ground bonding is made and how neutral and equipment grounding conductors are handled. Do not leave bonding assumptions to a generic note: provide the service location, grounding details, and relevant drawings for engineering review. The final configuration should be checked against the adopted electrical code and utility requirements by qualified project personnel.

Document Fault Duty and Installation Conditions

The available fault current is essential to selecting protective devices and evaluating the assembly. Provide the utility fault-current data or the project engineer’s calculated value at the switchboard, along with upstream protective device information and any required coordination criteria. Identify the required short-circuit rating or withstand basis where specified. These values are project inputs, not standard assumptions based solely on a 120/240 V system.

Also document indoor or outdoor placement, enclosure and environmental requirements, ambient conditions, access and working-space constraints, and any seismic or project-specific provisions. State applicable codes, standards, and documentation expectations. UL 891 is a standard for switchboards, but it should not be treated as a blanket listing claim for a particular configuration; verify the applicable standards and listing status for the quoted assembly.

Prepare a Complete New-Equipment Request

A useful pricing package includes the one-line diagram, load and circuit schedules, utility service data, fault-current information, device requirements, conductor and termination details, neutral and grounding scheme, enclosure conditions, and requested drawings or test documentation. Note whether the request is for a complete new switchboard or new retrofit components, and identify interfaces with existing equipment. We build to specification using American components when requested; component origin and documentation are confirmed for each quotation.

Share the required delivery destination, project milestones, approval process, and any restrictions on substitutions so the proposal can address the actual procurement need. Lead time is subject to project review and confirmation, as are engineering scope and available documentation. Installation, servicing, testing, and energization must be performed by qualified personnel under approved procedures. We serve Texas projects from the United States and review delivery requirements with each quotation.

LET'S BUILD SOMETHING

Start with
the details.

Tell us what you’re working on. The more you can share about your project, the better we can begin the conversation.

PROJECT INQUIRY

Request a quote

This form opens your default email application. Your inquiry is sent only when you send the email. You can also email us directly or call our team.

* Required fields

Request a quote