Website Accessibility

Website Accessibility Information

This page explains how to report an accessibility barrier on the Switchgear Builders Texas website. No accessibility standard, certification, or level of conformance has been established here. We manufacture and supply new electrical equipment, including new retrofit components. If you cannot use a page or obtain information in an accessible format, contact us and describe the issue and the information you need.

UL 891 switchboardsMADE IN USAFAST lead times
NEW EQUIPMENT. PROJECT FOCUSED.SERVING TEXAS
Electrical switchgear cabinet and control panel

NEW SWITCHGEAR FOR YOUR PROJECT

MANUFACTURING / EQUIPMENT / TEXAS

Accessibility information and current status

We want people researching new switchgear and retrofit components to be able to access useful information about our products and request process. This page does not assert that the website conforms to WCAG, Section 508, the ADA, or another accessibility standard. No audit results, accessibility certification, or verified conformance statement are available for publication here. Readers should not interpret the presence of this page as proof that every page, document, or feature is accessible.

Website content and functionality may differ across pages, devices, and assistive technologies. If a particular task is difficult—such as reading product information, navigating a form, or finding a document—report the specific page and barrier through a contact channel that is published and confirmed as current on this site. We will need to review each report before describing a fix or an expected resolution.

How to report a website access barrier

For a useful report, identify the page address, the task you were attempting, and what happened instead. If relevant, include the device, browser, operating system, and assistive technology involved, along with the approximate date and time. A short description is sufficient; screenshots or recordings are optional and should not include passwords, confidential project information, or sensitive personal data.

Include the page address and a brief description of the barrier. Use the phone number or email displayed on this website to report an access barrier. Include any difficulty using the contact options in your report. We cannot promise a response time or outcome before a report is received and assessed, but clear details can help identify the affected content and determine an appropriate next step.

Requesting product information in an accessible format

If a product page, specification, or project document is difficult to use, tell us which information you need and what format or adjustment would help you access it. For example, you can identify the equipment type, project stage, and specific details you are seeking, such as dimensions, ratings, interface requirements, or available documentation. Do not assume every document has an alternate format or that a requested format is immediately available; the request must be reviewed for the material involved.

Our equipment is new and built or supplied to project specifications. New retrofit components may also be considered when they are part of a defined project scope. Availability, engineering, component origin, lead time, and documentation depend on the configuration and must be confirmed for each quotation. An accessible-information request does not establish product availability or substitute for technical review.

Accessible formats and technical documents

Technical information can appear in web pages, forms, drawings, schedules, and other project documents. These materials may require different handling to make their information usable. When asking for help, name the particular document or data field and explain the access problem—for instance, whether text cannot be selected, a table is difficult to interpret, or a form control cannot be identified. This allows us to distinguish an access issue from a missing or project-specific technical detail.

Where a requested alternate format is feasible, the content still needs to preserve the meaning of the original technical information. Drawings, ratings, connection details, and equipment limitations should not be altered or summarized in a way that changes their engineering significance. Any alternate presentation remains subject to project review, and critical design information should be confirmed through the applicable project documentation and qualified engineering process.

Accessibility and project purchasing

Purchasing and engineering teams can help us respond to information needs by including accessibility requirements in an inquiry alongside the equipment scope. Specify whether the request concerns website content, quotation materials, product data, or project documents; identify the intended users and the task they need to complete. Also state any document format or communication adjustment that would help. This is more actionable than a general request for an accessible product or a broad claim of compliance.

For a switchboard or other assembly, define the electrical and physical requirements separately from the requested information format. Include the applicable project specifications, operating environment, interfaces, dimensions, and required documentation where known. UL 891 is a standard for switchboards, not a blanket designation for all switchgear; listing and applicable standards must be verified for the proposed configuration. Accessibility requests do not establish a listing, certification, or domestic-content compliance.

Review, updates, and safety boundaries

A reported barrier should be reviewed in context, including the affected page or document and the task a visitor is trying to complete. Changes may require content, design, or technical review, and a report does not guarantee that a specific change will be made. For accessibility questions, use the contact information on this website and describe the page or document involved.

Website accessibility does not replace safe electrical work practices or technical approval. Installation, servicing, testing, and energization of electrical equipment require qualified personnel following approved procedures. Do not rely on a website page or alternate-format summary as authorization to perform electrical work. For a project decision, use the current, configuration-specific documents and confirm requirements with the responsible qualified professionals.

LET'S BUILD SOMETHING

Start with
the details.

Tell us what you’re working on. The more you can share about your project, the better we can begin the conversation.

PROJECT INQUIRY

Request a quote

This form opens your default email application. Your inquiry is sent only when you send the email. You can also email us directly or call our team.

* Required fields

Request a quote