Set the voltage class from the system design
For a Fort Worth project, identify the system’s nominal voltage, maximum operating voltage, frequency, and grounding method before selecting a medium-voltage lineup. Also confirm whether the equipment connects to a utility service, a facility distribution bus, a generator, or another source. These details affect insulation coordination, switching duties, metering, and protection; a nominal voltage alone does not fully define the required equipment.
Provide the one-line diagram and identify any existing equipment interfaces if the new lineup must connect to an established system. Clarify bus configuration, source count, normal operating ties, and whether the design depends on maintaining continuity during a source transfer. We use this project information to evaluate the requested configuration rather than assuming a standard voltage class, arrangement, or compatibility with existing gear.
Choose breakers and switching arrangements by duty
Decide whether each circuit requires a circuit breaker for protective interruption or a switch arrangement for the switching duties allowed by the design. For breaker sections, document the intended protection scheme, operating sequence, and any interlocks. For a lineup with incoming, feeder, tie, or metering sections, show their relationships on the one-line and identify which devices must operate together or remain electrically isolated.
A useful scope review distinguishes normal switching from fault interruption and maintenance requirements. State whether the lineup is single-source or includes alternate sources, bus ties, or generator connections, and describe expected transfer logic. Do not rely on a generic description such as “main-tie-main” without clarifying operating modes, interlocking expectations, and control-power interfaces. The design engineer should confirm that the selected device duties match the system study.
Define relay and control interfaces early
Relay requirements should identify the protective functions, inputs, outputs, and communications needed for each circuit. Provide available instrument-transformer ratios and connection details, trip and close circuit expectations, control voltage, alarm points, and any required status indications. If relays or control equipment are owner-furnished, state that clearly and define who supplies wiring diagrams, terminal plans, settings, and interface components.
Coordinate communications with the facility’s monitoring or supervisory system before finalizing the control scheme. Identify the protocol or hardwired signals required, the party responsible for settings and coordination, and whether remote operation or only status reporting is intended. Relay selection and settings depend on a coordinated protection study and project requirements; they should not be inferred from a panel description or treated as a substitute for engineering review.
Coordinate cable entry and terminations
Cable connections can determine enclosure dimensions, compartment layout, and lineup placement. For each incoming, outgoing, or bus connection, provide cable type, conductor size and count, insulation details, termination method, and entry direction. Confirm whether cables enter from above or below, where the lineup can be accessed, and whether conduit, tray, or bus duct interfaces constrain the available space.
Specify termination and shielding requirements for the selected cable system, including any grounding provisions and phase spacing required by the design. Identify the intended cable routing and installation clearances, as well as access needed for qualified installers to make connections. These details are especially important for retrofit components: provide the existing equipment information, dimensions, connection locations, and interface drawings so fit and compatibility can be reviewed rather than assumed.
Match insulation and fault duty to study data
The insulation requirements must suit the system’s maximum voltage and the electrical environment specified for the installation. Describe relevant indoor or outdoor conditions, altitude, temperature, contamination, moisture exposure, and enclosure constraints. The project team should identify applicable environmental and design criteria so the proposed configuration can be reviewed against actual service conditions rather than a broad regional assumption about Fort Worth.
Fault-duty selection requires study data, including available short-circuit current at the connection point, clearing time assumptions, and the coordination basis used by the design team. Provide the required interrupting and withstand criteria for the intended devices and bus, as applicable to the design. Confirm these values against the current system study; do not infer fault capability from voltage class or from the description of an existing lineup.
Build a quotation package that supports review
A complete request for pricing can include the one-line diagram, equipment layout, circuit schedule, control schematics, cable data, environmental conditions, and fault-study criteria. Add the applicable project specifications and identify requested standards, documentation, and inspection requirements. For new retrofit components, include equipment nameplate information and interface drawings where available. Clear scope boundaries—such as owner-furnished relays or installation by others—help prevent assumptions during technical and commercial review.
We supply new equipment and new retrofit components, and build to the accepted project specification using American components as requested. Component origin, configuration, engineering, lead time, and available test documentation are confirmed for each quotation; domestic-content compliance should not be assumed. Applicable standards and any listing must be verified for the specific configuration. Installation, servicing, testing, and energization require qualified personnel working under approved procedures.