What an interlock does
An interlock establishes a permitted sequence or condition for operating equipment. A mechanical interlock may use a physical linkage, key arrangement, or blocking mechanism to prevent a handle or device from moving in an incompatible state. An electrical interlock uses control-circuit logic or contacts to inhibit an operation when a required condition is absent. Some assemblies use both approaches, but the design must be evaluated as a specific system.
An interlock is not the same as a disconnect, breaker, protective relay, or lockout procedure. Those devices and procedures serve different purposes, and an interlock does not by itself establish that equipment is de-energized or safe to service. When reviewing a design, identify the exact operation being restricted, the condition that permits it, and how the arrangement behaves if a control signal or component fails.
Source-transfer example
Consider a distribution system with a normal utility source and an alternate generator source. If the intended operating scheme transfers the load from one source to the other without paralleling them, an interlock can prevent the source breakers from being closed in a prohibited combination. The arrangement may allow the alternate breaker to close only after the normal-source breaker is open, subject to the project’s transfer sequence and control design.
That example does not determine whether transfer is open-transition, closed-transition, automatic, or manually initiated. Those are separate design decisions with implications for controls, protection, and source coordination. The project documents should state the allowed breaker states and transfer sequence, whether a bypass or maintenance mode is required, and which device or devices provide the interlock function.
Mechanical and electrical approaches
A mechanical interlock can physically link operating mechanisms so that movement of one device constrains another. It may be appropriate when the design needs a direct mechanical restriction independent of a control command. The scope depends on the exact breakers, operators, mounting arrangement, and enclosure layout; compatibility should not be assumed from matching voltage or frame descriptions alone.
An electrical interlock typically uses auxiliary contacts and control circuitry to allow or block a command based on device status or another defined input. It can support more complex sequences, but depends on the specified control scheme and associated components. When comparing approaches, ask what condition is sensed, whether the interlock blocks closing, opening, or both, and what indication is available to the operator.
Define the required operating logic
For quotation and engineering review, provide a one-line diagram and a clear operating description. Identify every source and switching device involved, the normal and alternate states, the permitted transfer path, and any combinations that must be prevented. State whether the system is manually operated or controlled automatically, and describe relevant modes such as test, bypass, maintenance, or emergency operation.
Also clarify what should happen after a loss of control power, a failed status contact, or an incomplete switching sequence. These conditions can affect whether the design inhibits an operation, signals an alarm, or requires a defined recovery step. The manufacturer should review the requested logic against the proposed equipment configuration; a glossary definition alone cannot establish the correct interlock design.
New equipment and retrofit scope
Switchgear Builders Texas manufactures new equipment and supplies new retrofit components only. For a new assembly, provide the required device arrangement, interlock functions, control requirements, drawings, and applicable project standards so the configuration can be reviewed for the intended operation. Equipment details, component origin, availability, lead time, and documentation are confirmed for each quotation rather than assumed from a general description.
For a retrofit, identify the existing equipment manufacturer and model information, device type, nameplate data, photographs, dimensions, and available drawings. Explain what function the proposed new component must provide and which existing mechanisms or controls it must interface with. Compatibility, engineering scope, and suitability depend on review of the specific assembly; do not assume a replacement or retrofit component will fit based only on a broad product category.
Documentation, standards, and safe use
Request drawings that show the interlock’s relationship to the switching devices and control circuit, along with a written sequence of operation. Ask which assumptions remain open and what project information is needed to resolve them. For switchboard assemblies, UL 891 may be relevant, but it is a switchboard standard and does not automatically establish a listing for every configuration or component. Verify applicable standards and listing status for the specific assembly.
The interlock’s purpose and limits should be documented for operators and maintenance personnel. Installation, servicing, testing, and energization require qualified personnel following approved procedures; this glossary is not an operating or field-work instruction. When requesting pricing, submit the project drawings, operating sequence, required interlock behavior, and retrofit identification details. That information supports a configuration review before equipment scope, documentation, and commercial terms are finalized.