Medium-Voltage Equipment

Medium-Voltage Switchgear

We manufacture new medium-voltage switchgear to project specifications and serve Texas from the United States, with shipping available nationwide. The right configuration depends on the system’s actual operating voltage, available fault current, protection scheme, installation environment, and utility or facility requirements. We supply new equipment and new retrofit components only. Availability, engineering, lead time, component origin, and test documentation are confirmed during quotation review.

UL 891 switchboardsMADE IN USAFAST lead times
NEW EQUIPMENT. PROJECT FOCUSED.SERVING TEXAS
Electrical switchgear equipment viewed from the side

NEW SWITCHGEAR FOR YOUR PROJECT

MANUFACTURING / EQUIPMENT / TEXAS

Select a Configuration for the System

Medium-voltage switchgear can be arranged for different service and distribution needs, including metal-clad assemblies with drawout breakers, metal-enclosed lineups, and configurations using fused switches where the application permits. The one-line diagram should establish incoming sources, bus arrangement, feeder count, tie requirements, metering points, and any provisions for future circuits. These details shape the lineup and help avoid specifying a product category that does not match the operating scheme.

For a project in Texas, define whether the gear serves a utility interface, plant distribution system, campus, or other facility, and identify the service conditions at that location. Share the one-line, load information, site elevation if relevant, indoor or outdoor exposure, space constraints, and planned expansion. We use those inputs to review the requested arrangement; a product description alone is not enough to establish suitability or confirm availability.

Match Class to Actual System Voltage

Choose the equipment class using the system’s nominal and maximum operating voltage, not a rounded description or a voltage value copied from unrelated equipment. The design review should also account for insulation coordination and the applicable system conditions. Confirm the exact voltage at the point of connection, grounding method, frequency, and any utility requirements, then state these clearly in the equipment specification and request for pricing.

A class selected too narrowly can leave insufficient margin for the actual system, while an unnecessarily high class may affect the design and cost without solving a real requirement. The switchgear nameplate ratings, breaker ratings, bus ratings, and insulation requirements must work together. We review these parameters for the requested configuration, but final class selection and approval remain tied to project engineering and applicable codes and standards.

Define Breaker Compartments and Access

In drawout designs, breaker compartments, shutters, primary disconnects, control connections, and racking provisions are part of the coordinated assembly. Specify the number and function of breaker positions, whether spare compartments are required, and how the lineup will be accessed for inspection or replacement. Also identify any auxiliary compartments for metering, control, or instrument transformers. These choices influence the physical arrangement and the interfaces between compartments.

For replacement or expansion work, provide existing lineup drawings, compartment dimensions, connection details, breaker identification, and photographs where available. A new retrofit component must be matched to the specific existing equipment and its electrical and mechanical interfaces; a similar-looking breaker is not necessarily compatible. We supply new retrofit components only, subject to engineering review and confirmation that the requested configuration can be supported.

Choose Insulation for the Application

Medium-voltage designs may use air-insulated or other insulation arrangements depending on the equipment configuration and project requirements. Selection affects dimensions, compartment layout, maintenance access, environmental considerations, and the documentation needed to assess the assembly. State whether the gear will be installed indoors or outdoors, describe expected ambient and contamination conditions, and identify any space or access limits that the design must respect.

Insulation requirements should be coordinated with system voltage, clearances, grounding, surge protection, and the equipment’s specified withstand levels. Avoid treating insulation type as a stand-alone preference: the choice must fit the complete lineup and installation. For quotation review, include the project specification and any required environmental or seismic criteria. Applicable standards and listing status should be verified for the precise configuration rather than assumed from a general product category.

Coordinate Relaying, Metering, and Controls

Protection design determines what relays, current transformers, voltage transformers, control power, and trip or close circuits are needed. Provide the protection philosophy, relay functions, required communications, metering scope, and interface expectations for the facility or utility. Identify whether breaker failure, transfer logic, interlocking, or remote status and control are part of the project. These inputs let the equipment design account for wiring, auxiliary space, and control connections.

Relay settings depend on a coordinated protection study and the connected system; they should not be inferred from a generic switchgear description. Clarify who supplies settings, performs studies, reviews control schematics, and approves final documents. During quotation and engineering, request the drawings and documentation needed by the project team, including applicable wiring diagrams and equipment data. Testing, commissioning, and energization must be performed by qualified personnel under approved procedures.

Prepare a Complete Specification and Purchase Scope

A useful request for pricing includes the one-line diagram, system voltage, available fault-current information, bus and breaker requirements, lineup dimensions, cable entry and termination preferences, protection and metering scope, environmental conditions, and applicable project standards. Note the required delivery destination and schedule expectations, but treat lead time as subject to project review. Identify required submittals, drawing review milestones, and any factory documentation requested for acceptance.

We build new equipment to specification and can quote new retrofit components when the existing interface is sufficiently documented. Customers may specify American components; component origin and project requirements must be reviewed for each quotation, and no independent domestic-content verification or compliance certification is implied. UL 891 applies to switchboards, not universally to medium-voltage switchgear. Confirm applicable standards and any listing requirements for the requested assembly before purchase.

LET'S BUILD SOMETHING

Start with
the details.

Tell us what you’re working on. The more you can share about your project, the better we can begin the conversation.

PROJECT INQUIRY

Request a quote

This form opens your default email application. Your inquiry is sent only when you send the email. You can also email us directly or call our team.

* Required fields

Request a quote