Map Classified Areas and Equipment Boundaries
Begin with the project’s hazardous-area classification documents and the locations of proposed switchboards, distribution equipment, and connected loads. Identify which spaces are classified, which are ordinary, and where the boundary falls in relation to each enclosure, cable entry, and operating face. A facility-wide label such as “oil and gas” does not establish the classification at a particular installation point.
For each equipment location, provide the governing classification basis and the applicable area, division or zone, gas or vapor group, and temperature information where those designations apply. Include current plot plans, classified-area drawings, and revisions. If boundaries or classifications are unresolved, flag them before quotation; assumptions can affect enclosure selection, component interfaces, installation requirements, and the scope of equipment that must be separately certified.
Separate Distribution Equipment from Classified Components
A distribution assembly and a device installed in a classified location may have different compliance paths. Depending on the design, the switchboard or other equipment may be located in an ordinary area while separately certified components are installed within a classified boundary. Identify those components by function and location—for example, field devices, control stations, wiring interfaces, or accessories—rather than treating the complete distribution assembly as automatically suitable for every area.
Provide the specified certification and marking requirements for each component that must operate in a classified location, along with the applicable classification and installation constraints. Confirm whether the component is supplied as part of the equipment scope or by another party, and define who is responsible for compatibility review. We supply new equipment and new retrofit components only; any required certification, markings, and suitability must be verified for the exact component and application.
Define Electrical and Load Requirements
A useful equipment review needs the electrical system parameters, not only the process-area classification. Submit system voltage, phase and frequency, available fault-current information, source configuration, grounding method, and the required distribution functions. Provide load schedules, motor-starting or other significant load information, and anticipated future loads where applicable. These details help establish the assembly arrangement and identify interfaces that need engineering review.
State the required main and feeder devices, metering, protective functions, control power, and communications interfaces. Clarify whether equipment must coordinate with upstream or downstream protection and provide relevant study criteria or project documents. Do not rely on an assumed rating or a generic oil-and-gas package: current, voltage, interrupting capability, and other design parameters are confirmed against the specific project and included in the quotation only when reviewed.
Coordinate Enclosures, Entries, and Environmental Exposure
Equipment placement can introduce requirements beyond area classification. Describe indoor or outdoor installation, ambient conditions, moisture, dust, corrosive exposure, vibration, washdown, and any process-related hazards identified by the project. Include enclosure requirements and the equipment room or skid arrangement. These details help determine whether the proposed assembly and its interfaces are appropriate for the stated environment; they do not establish suitability for a classified location by themselves.
Show cable and conduit entry zones, conductor approach, mounting constraints, access clearances, and termination space on drawings or interface schedules. Identify whether penetrations land within an ordinary area or a classified boundary and specify any project-mandated fittings or barriers by responsible scope. If a separately certified component, seal, or enclosure is required at an interface, name it in the documents and confirm its intended location and compatibility before release.
Plan New Retrofit Components and Scope Boundaries
For retrofit work, document the existing equipment manufacturer and identification, enclosure dimensions, bus arrangement, electrical characteristics, connection points, and the function of the component being replaced or added. Provide clear photographs and current drawings where available, plus the classified-area documents for the installation location. This information supports a compatibility review; appearance or a matching catalog description alone is not enough to establish mechanical, electrical, or location suitability.
Specify that replacement components are new, identify the equipment they must interface with, and state whether the work is a component replacement, an addition, or a broader equipment change. Define who supplies field wiring, classified-location fittings, installation labor, and any required engineering updates. We manufacture and supply new equipment and new retrofit components.
Verify Standards, Documentation, and Quotation Basis
Include the project’s applicable electrical codes, owner specifications, required standards, submittal format, and document review milestones. Identify any requested inspection, test, or certification documentation and the exact assembly or component to which each requirement applies. UL 891 applies to switchboard assemblies; it is not a blanket listing for all switchgear or every separately certified component. Listing and applicable standards must be verified for the proposed configuration.
Before requesting pricing, provide the latest one-line diagram, equipment schedules, area classification drawings, enclosure requirements, interface details, and open technical questions. We review these materials to establish the quotation basis, confirm which requirements can be addressed, and identify items needing clarification. Availability, engineering, component origin, lead time, and test documentation are confirmed for each quotation; specify American components as a project requirement and request confirmation for the proposed configuration.