Define the process-unit feeder architecture
Start by mapping each process-unit feeder from its source to the equipment it serves. Identify the normal source, alternate source if applicable, upstream distribution, feeder destination, and any intermediate equipment. Show tie breakers and normally open or closed points on the one-line diagram. This establishes where isolation and protection are needed and helps distinguish unit-level distribution from plant-wide service equipment.
For each feeder, provide the project voltage, phase, frequency, design current, protective-device requirements, and available fault-current information at the intended connection point. Clarify whether the scope includes incoming devices, outgoing feeders, metering, control interfaces, or only the assembly. These details allow us to review a compatible new configuration; they do not establish that a particular rating or arrangement is available before engineering review.
Plan continuity around process consequences
Load continuity requirements should follow the process consequence of an interruption. Identify which loads must remain energized, which may be restored after a brief transfer, and which can stop without creating an unacceptable process condition. State any required source-transfer sequence, interlocks, restart restrictions, or load-shedding priorities. A continuity objective without its operating sequence can leave important behavior undefined in the equipment scope.
Tell us how the unit is expected to operate during source loss, maintenance isolation, and return to normal supply. Note whether the process depends on a particular order for restarting motors or restoring control power, and whether standby generation or another source is part of the design. The owner’s electrical and process teams should resolve those operating assumptions before quotation so the distribution arrangement can be reviewed against actual project needs.
Document motor duties and starting conditions
Motor schedules should identify each motor’s load, voltage, horsepower or other specified size, full-load current, starting method, and expected duty cycle. Include acceleration or inrush information where available, plus whether operation is continuous, intermittent, cyclic, or standby. Pumps, compressors, and other driven equipment may impose different starting and operating demands even when served from the same process unit.
State whether motors are started across the line or through project-specified reduced-voltage or variable-speed equipment, and identify which equipment is included in the distribution scope. Provide any limits on voltage dip, starting frequency, sequential restart, or simultaneous operation. These inputs support review of feeder and protective-device coordination with the connected loads; they do not substitute for motor-control engineering or verification of the complete system.
Coordinate protection across unit boundaries
Protection must be considered from the process-unit feeder through the upstream source and downstream load. Provide the available fault current, upstream protective-device data, grounding arrangement, and the project’s required coordination or selectivity objectives. Identify any protective settings or device types mandated by the electrical design. Without upstream and downstream context, a distribution assembly cannot be assessed meaningfully for its role in the complete protection scheme.
Ask the project engineer to identify the required study inputs and whether coordination, short-circuit, arc-flash, or other analyses will be performed by the project team or a designated engineer. Supply relevant study results when they are available, and state any assumptions that remain open. We can review equipment scope against the information provided, but final system protection decisions and field settings belong to qualified project professionals under approved procedures.
Account for process-site conditions and interfaces
Describe the intended installation environment and mounting arrangement, including indoor or outdoor placement, ambient conditions, elevation if relevant, contamination concerns, and available space or access constraints. Identify cable entry direction, conductor termination needs, and maintenance clearances established by the project. These factors can affect enclosure and assembly choices, so they should be stated rather than inferred from the chemical or petrochemical facility type.
List interfaces with process controls, instrumentation, emergency systems, and supervisory monitoring that are within the electrical equipment scope. Specify needed signals, communications requirements, control-power expectations, and responsibility boundaries between suppliers or contractors. We serve Texas projects from the United States and ship nationwide; site-specific conditions and delivery arrangements are reviewed for each quotation.
Scope new equipment, documentation, and retrofit components
For procurement, identify the required equipment type, design basis, project specifications, drawings, submittal schedule, and requested documentation. If the application calls for a switchboard assembly, UL 891 is the relevant switchboard standard; it is not a blanket listing for every type of switchgear. Listing status and applicable standards must be verified for the specific configuration. Any requested test records or component-origin requirements should be stated and confirmed for the quoted scope.
We supply new equipment and new retrofit components only. For a retrofit, provide the existing assembly identification, dimensions, connection details, drawings, and the function the replacement component must perform. Compatibility depends on the particular equipment and project review. Request pricing against the complete technical package, noting open decisions and required submittal dates so availability, engineering, lead time, component origin, and documentation can be assessed before an order.