We manufacture new service entrance switchboards to project specifications for customers in San Antonio and across Texas, shipping from the United States. These assemblies establish the point where utility service enters a facility and connect utility requirements with the building’s distribution system. Early coordination is essential: service configuration, metering, disconnect arrangement, incoming conductors, grounding and applicable standards all affect the equipment design. Availability, engineering, components, lead time and documentation are reviewed for each quotation.

UL 891 switchboardsMADE IN USAFAST lead times
NEW EQUIPMENT. PROJECT FOCUSED.SERVING TEXAS
Electrical switchgear installed in an equipment room

NEW SWITCHGEAR FOR YOUR PROJECT

MANUFACTURING / EQUIPMENT / TEXAS

Coordinate the service design with the utility

For a San Antonio service entrance project, begin by confirming the serving utility’s current service requirements with the utility and the project’s electrical design team. Establish the service voltage and phase, available service arrangement, point of delivery, metering method, fault-current information and any restrictions on service equipment configuration. Requirements can vary by project and utility review; a proposed switchboard should not be assumed acceptable solely because it matches a previous installation.

Share the utility service documents, one-line diagram and applicable project specifications when requesting pricing. Identify who will obtain service approval, provide metering details and resolve comments, and clarify whether utility review is a prerequisite to equipment release. We can evaluate the specified new assembly against the information provided, identify open design questions and confirm which technical documents can be supplied with the quotation or submittal.

Define service disconnects and section arrangement

The service disconnect arrangement determines how incoming power is isolated and distributed to downstream equipment. Specify the number and type of disconnects, their assigned loads, the intended sequence of sections and how the switchboard relates to downstream distribution. Include the project’s one-line diagram and load information, and state any required separation, access or labeling provisions. These choices influence the physical layout and should be resolved before equipment dimensions and interfaces are finalized.

Ask the engineer of record to confirm the governing electrical code, disconnect requirements and project-specific protection criteria. Coordinate the main and feeder devices with the overall distribution design rather than treating the service entrance board as a stand-alone purchase. Protection settings and selectivity decisions belong to the project design and must be reviewed with the responsible professionals. We can build to the approved specification, subject to engineering review of the requested configuration.

Plan the metering compartment before layout approval

Metering requirements affect both the switchboard design and the utility coordination process. Confirm whether the project calls for utility metering, customer metering or another specified arrangement, and obtain the utility’s requirements for compartment location, access, barriers, instrument-transformer provisions and wiring interfaces. Clarify who furnishes each metering component and whether the utility expects to review drawings before fabrication. Do not rely on assumptions from another building or service account.

Include meter-compartment details in the equipment submittal review, alongside the one-line diagram and elevations. Check that access and working space can be maintained in the planned electrical room and that the metering section’s position fits the approved service layout. If the utility revises its requirements, determine whether the change affects dimensions, components or connections before releasing the design. The final configuration and any utility-specific provisions must be confirmed for the individual quotation.

Resolve incoming conductor and termination details

Incoming conductors must match the service design and the switchboard’s specified connection provisions. Provide the conductor material, quantity, size, insulation details and intended entry direction, together with the service information needed to evaluate termination arrangements. Confirm whether conductors enter from above or below, the available routing space and any constraints imposed by the building, raceways or utility point of delivery. These details affect section layout and should be coordinated before drawings are approved.

Review terminal requirements, bending space, lug provisions and the transition to the downstream distribution system with the electrical engineer and installation contractor. Identify responsibility for raceways, conductors, connectors and field connections, and document any interfaces that are outside the equipment scope. Do not infer that a particular conductor arrangement is available from a general product description; engineering feasibility and components are confirmed for the specified assembly. Installation and connections require qualified personnel following approved procedures.

Document grounding and bonding requirements

Grounding and bonding at the service entrance depend on the system arrangement and the applicable project design. Provide the grounding and bonding requirements shown on the approved drawings, including the intended connection points and coordination with the building grounding electrode system. Clarify how neutral and equipment-grounding connections are handled in the service equipment, and identify any project-specific provisions required by the engineer or utility. Avoid carrying details forward from another site without confirming they suit this service.

Review grounding details alongside the service one-line, equipment layout and installation scope. Establish which connections are furnished as part of the switchboard and which are made in the field, and ensure the drawings communicate those boundaries clearly. The responsible design professional must verify compliance with applicable codes and project requirements. Any equipment documentation or configuration related to grounding should be confirmed during quotation and engineering review, rather than treated as a universal feature.

Review specifications, submittals and retrofit scope

For a new installation or retrofit, identify the existing conditions that the new service equipment must accommodate. Useful information includes available room dimensions, existing raceway locations, service and load data, interface drawings, photographs and the current one-line diagram. Specify new equipment or new retrofit components only, and define whether the work replaces the complete service entrance assembly or connects to retained equipment. Confirm the scope boundary so the quotation reflects the intended interfaces rather than unlisted field work.

Before purchase, review the proposed configuration, drawings, applicable standards, component details and available test or engineering documentation for the specific assembly. UL 891 applies to switchboards, but it is not a blanket listing for every switchgear configuration; verify the applicable standards and listing requirements for the proposed equipment. Component origin and lead time are also confirmed for each quotation, and American components should be identified as a project requirement without assuming independent domestic-content certification. Request pricing with the project documents and open utility questions included.

LET'S BUILD SOMETHING

Start with
the details.

Tell us what you’re working on. The more you can share about your project, the better we can begin the conversation.

PROJECT INQUIRY

Request a quote

This form opens your default email application. Your inquiry is sent only when you send the email. You can also email us directly or call our team.

* Required fields

Request a quote