A–C: Ampacity, Bus, and Coordination
Ampacity is the current-carrying capability assigned to a conductor or assembly under stated conditions. It is not interchangeable with the protective-device trip setting. When reviewing a proposed assembly, compare the specified continuous current, conductor material, temperature assumptions, enclosure conditions, and any project derating requirements. For a focused explanation, see our guide to switchgear ampacity and rating terminology.
Bus is the conductive path that distributes power among incoming sources, protective devices, and outgoing circuits. Bus arrangement, material, ampacity, and bracing requirements belong in the equipment specification rather than being inferred from a single headline rating. Coordination describes how protective devices are selected and adjusted to limit unnecessary interruption while responding to faults. Our bus design and protection-coordination explanations cover the information to resolve before a quotation.
D–F: Dead Front, Feeder, and Fault Current
Dead front describes an arrangement that limits access to energized parts from the normal operating side when covers or doors are in their intended position. The term does not mean equipment is safe to open or service while energized. Enclosure construction, barriers, access requirements, and operating procedures should be reviewed for the actual application. See the dead-front switchgear explanation for related design questions.
A feeder is a circuit that carries power from a distribution assembly toward downstream equipment or another distribution point. Its protective device, conductor requirements, destination, and load information should agree across the one-line diagram, schedules, and equipment specification. Fault current is the current that may flow during a short circuit at a particular point in the system. The available value affects equipment selection and must be established from project system data; see our feeder and fault-current guides.
G–L: Grounding, Interrupting Rating, and Main Device
Grounding connects designated system or equipment parts to ground in accordance with the system design and applicable requirements. Grounding method, neutral arrangement, and bonding details can affect how protective devices respond and how an assembly is configured. They should be stated or clearly shown in project documents, not assumed from a general equipment description. Our grounding and neutral terminology guide explains the information to coordinate.
Interrupting rating describes a protective device’s capacity to interrupt a stated level of fault current under specified conditions. It is distinct from the assembly’s withstand or short-circuit rating, and the terms should not be substituted for one another. A main device is the principal incoming protective or switching device, but its function depends on the arrangement. For a focused explanation, consult our interrupting-rating and main-device guides, then confirm ratings against the project study and equipment configuration.
M–R: Metering, One-Line Diagram, and Retrofit
Metering is the measurement of electrical quantities such as current, voltage, energy, or demand. A specification should identify the measurements needed, instrument or meter requirements, sensing method, and any communications or reporting interface that the project requires. A meter location alone may not define the complete requirement. See the metering and instrumentation explanation for questions to resolve with the design team.
A one-line diagram represents an electrical system using simplified symbols to show sources, buses, protective devices, and circuits. It is a key reference for comparing equipment quotations with the intended system arrangement. Retrofit means adapting or replacing components in existing equipment; it does not establish that a new component will fit or function in a particular enclosure. We supply new retrofit components only. Review our one-line diagram and retrofit-scoping guides, and provide existing equipment identification and dimensions for project review.
S–U: Selectivity, Switchboard, and UL 891
Selectivity is the intended behavior in which the protective device nearest a fault operates while upstream devices remain in service where the system design permits. It depends on device characteristics, settings, fault levels, and the system study. It cannot be confirmed from a device name or frame size alone. Our selectivity explanation outlines the coordination information to share when specifying new equipment.
A switchboard is a low-voltage power distribution assembly; UL 891 is a standard for switchboards, not a universal standard for every type of switchgear. Whether a particular configuration is listed and which standards apply must be verified for that assembly and project. Do not assume a listing from a general product description. See our switchboard standards guide and request confirmation of applicable standards and documentation as part of the quotation.
V–Z: Voltage, Withstand Rating, and Quotation Terms
Voltage is the system’s electrical potential, and a project specification should identify the applicable system voltage and arrangement rather than relying on an abbreviated equipment label. Current and voltage in a page heading are design parameters, not a promise that a particular configuration is available. Our voltage-selection explanation covers what to verify against the one-line diagram, connected loads, and project requirements.
Withstand rating refers to an assembly’s ability to withstand specified short-circuit stresses for stated conditions; it is not the same as a protective device’s interrupting rating. For a quotation, provide the one-line diagram, equipment schedule, fault-current information, environmental and enclosure requirements, preferred component details, and requested documentation. We build to specification using American components when specified; component origin and documentation require confirmation for each quotation. Ask for pricing for new equipment or new retrofit components. Installation, servicing, testing, and energization require qualified personnel working under approved procedures.