Define the 27 kV-Class Voltage Basis
Start with the system’s nominal voltage, highest voltage expected in normal service, grounding method, frequency, and connection to the utility or upstream source. “27 kV class” is a classification prompt, not confirmation that a particular assembly fits every system. The equipment’s rated maximum voltage must be suitable for the actual application, and the proposed rating and configuration require engineering review before they are treated as selected.
Provide the one-line diagram and identify incoming, outgoing, bus-tie, and transformer-feeder functions. Note whether the lineup connects to an existing installation and describe its interface requirements. These details help establish breaker duties, bus arrangement, metering, and control needs. If the project specification gives a nominal voltage but not the required maximum voltage or insulation basis, resolve that gap before requesting final pricing.
Match Insulation to the Installation
Insulation coordination depends on more than voltage class. The design review should consider the specified insulation level, service environment, clearances, cable terminations, and the effects of altitude or other project conditions where applicable. State any owner or utility requirements for insulation testing and documentation. The requested insulation basis should be checked against the system study and equipment configuration rather than assumed from the class designation.
Describe the installation environment, including indoor or outdoor application, ambient conditions, contamination concerns, and any space or access constraints that affect the lineup. Identify cable type, entry direction, termination arrangement, and whether surge protection is part of the project scope. These choices influence the compartment layout and interfaces. Applicable standards and any product listing should be verified for the specific proposed configuration.
Establish Short-Circuit Duty and Breaker Requirements
Specify the available short-circuit current at the switchgear location and provide the study basis, including source conditions and relevant system configurations. The review must account for the required interrupting duty and the switchgear assembly’s short-time withstand duty, as well as the protection clearing assumptions that affect exposure. Do not select a breaker from voltage class alone; the required duty must be checked against the complete proposed arrangement.
For each feeder and main section, provide the connected equipment, load purpose, expected operating sequence, and any motor or transformer characteristics relevant to fault and switching studies. Identify the required breaker operating features and control power needs in the project specification. If the fault study is preliminary, mark the values as provisional and explain when they will be finalized so the quotation scope reflects unresolved design inputs.
Coordinate Relaying, Controls, and Metering
Describe the protection functions required for mains, ties, and feeders, and identify the coordination study or protection philosophy governing them. Specify whether the project requires particular relay capabilities, current and voltage inputs, communications, event records, or interlocking interfaces. Relay selection and settings depend on the system study and control scheme; a generic 27 kV-class designation does not establish a complete protection package.
Provide control schematics, interface points, alarm requirements, and the intended source of control power where these are defined. Clarify whether metering is required on incoming sections, feeders, or both, and state the measurement and communication needs. Identify owner standards and desired drawing or data formats. Availability of components, engineering scope, and supporting documentation should be confirmed for the quoted configuration rather than presumed.
Plan Breaker Sections and Compartments
A metal-clad lineup is organized into functional sections and compartments, so define the sequence and purpose of each section early. Identify main, bus-tie, feeder, metering, and auxiliary compartments as applicable, along with bus requirements and intended lineup growth. Confirm whether the project needs a particular access orientation, cable entry path, or arrangement for adjacent equipment. These decisions affect footprint, interfaces, and the drawings required for coordination.
For a retrofit, distinguish between replacing a complete section and using new retrofit components within an existing installation. Provide the existing equipment identification, drawings, compartment dimensions, bus and control interfaces, and photographs or field records where available. Compatibility cannot be assumed from a voltage-class match or a similar appearance. The existing configuration must be reviewed to establish whether the requested new components can be engineered for the stated application.
Prepare a Complete Request for Pricing
A useful request for pricing includes the one-line diagram, equipment specification, system voltage basis, fault study, lineup elevation or room constraints, feeder schedule, and relay and metering requirements. Add the applicable standards, project schedule expectations, shipping destination, and any owner-approved component requirements. We build to specification using American components when specified; component origin and documentation are confirmed for the quoted scope, without implying independent verification or blanket domestic-content compliance.
Ask the quotation to identify its engineering assumptions, included sections and components, available drawings and test documentation, and any information needed to finalize the design. Lead time is subject to project review and confirmation for the requested configuration. Installation, service, testing, and energization must be performed by qualified personnel under approved procedures. Review the quoted ratings, interfaces, and documentation against the project requirements before release for manufacture.