27 kV-Class Equipment

27 kV-Class Metal-Enclosed Switchgear

We manufacture new 27 kV-class metal-enclosed switchgear to project specifications for customers across Texas and ship nationwide from the United States. A useful specification must go beyond the voltage class: it should define the system’s maximum operating voltage, fault duty, grounding, switching or interruption method, cable interfaces, and operating interlocks. We review these requirements for each quotation; ratings, configuration, component origin, lead time, and documentation are subject to project review and confirmation.

UL 891 switchboardsMADE IN USAFAST lead times
NEW EQUIPMENT. PROJECT FOCUSED.SERVING TEXAS
Electrical switchgear lineup in a workshop

NEW SWITCHGEAR FOR YOUR PROJECT

MANUFACTURING / EQUIPMENT / TEXAS

Define the 27 kV System and Duty

Start by identifying the nominal system voltage and the maximum voltage for which the equipment must be suitable. Also provide frequency, phase arrangement, grounding method, and whether the installation is indoor or outdoor. The 27 kV class identifies an equipment class, not the project’s complete electrical duty. System data helps determine insulation requirements and whether the proposed arrangement fits the application.

Fault information needs equal care. Supply the available symmetrical fault current at the switchgear location, the expected system X/R ratio when available, and the required short-circuit duration or clearing assumptions. Distinguish continuous current from momentary, short-time, and interrupting requirements; these are not interchangeable ratings. The engineer of record should confirm the governing study and design basis so the quoted equipment is evaluated against the actual installation conditions.

Choose a Switch-and-Fuse or Breaker Arrangement

A 27 kV-class lineup may use load-interrupter switches with fuses, circuit breakers, or a coordinated combination suited to the one-line diagram. Identify which feeder or transformer circuits need switching, overcurrent protection, isolation, and visible means of disconnect. For fused circuits, provide the protected equipment data and protection objectives so fuse selection and coordination can be reviewed rather than inferred from the voltage class alone.

For breaker arrangements, specify the intended protective functions, control power, trip and close requirements, and any interface to relays or supervisory controls. Provide relay or control schematics when they are available, and identify required auxiliary contacts or remote status points. The correct choice depends on the system study, coordination approach, operating procedures, and project standards. We confirm the proposed arrangement and applicable ratings as part of quotation review.

Verify Interrupting and Short-Circuit Ratings

Request ratings that correspond to each interrupting device and the complete assembly’s intended duty. For a fuse arrangement, verify the fuse’s interrupting capability, voltage suitability, and coordination with upstream and downstream protection. For a breaker, identify required interrupting current and operating duty, along with any project-specific momentary or short-time requirements. A 27 kV class designation alone does not establish that these values are adequate for the available fault current.

Provide the latest short-circuit and coordination study, or clearly identify its assumptions and status. Confirm whether future utility changes, transformer upgrades, or parallel sources could increase fault duty. The quotation should document the ratings and configuration being offered, while the project team verifies them against applicable standards and the final study. Do not treat a component rating as proof that every lineup configuration has the same rating.

Coordinate Cable Terminations and Access

Cable entry and termination details can determine compartment layout and installation clearances. Specify cable type, conductor material, size and quantity per phase, insulation and shield construction, and whether cables enter from above or below. Identify the intended termination style and interface requirements, including provisions for stress control, grounding, and cable support. Provide available bend-radius, trench, and access constraints so the arrangement can be reviewed before equipment dimensions are finalized.

Clarify whether incoming and outgoing cables use a common arrangement or differ by circuit. Document any bus connections, transitions, or interfaces to transformers and existing equipment, with drawings where possible. Confirm the project’s required working space and route for bringing cables into the enclosure. Termination components and their suitability for the selected cable must be confirmed for the specific quotation; do not assume a cable accessory is included unless the quoted scope says so.

Specify Interlocks and Operating Boundaries

List each required mechanical and electrical interlock by the condition it must prevent. Examples include preventing access to an energized compartment, restricting switch operation when a grounding device is engaged, or coordinating a fuse compartment door with the operating device. The one-line diagram, operating sequence, and project safety requirements should agree. State any key-interlocking scheme and identify which locks or keys are part of the intended interface.

Interlocks are configuration-specific and should be reviewed as a complete operating sequence, not as isolated options. Provide the expected normal and maintenance states, permitted switching order, and any interface with upstream equipment. Identify whether auxiliary electrical permissives or remote-control restrictions are required in addition to mechanical provisions. Final procedures, installation, servicing, testing, and energization must be performed by qualified personnel under approved project procedures.

Scope New Equipment and Project Documentation

This page concerns new 27 kV-class equipment and new retrofit components only. For a retrofit, provide the existing manufacturer and model information, nameplate data, compartment and connection drawings, photographs, and the intended replacement boundary. Identify what will remain in service and any dimensional, bus, cable, control, or interlock interfaces that must be matched. Compatibility is determined by engineering review; do not assume a new component will fit or function in existing equipment based only on voltage class.

For a complete new lineup, send the one-line diagram, load and fault data, site conditions, cable schedule, control requirements, and applicable project specifications with the pricing request. Identify required submittals, drawing review milestones, test documentation, and standards or listing requirements. UL 891 applies to switchboards, not automatically to 27 kV-class metal-enclosed switchgear; verify the standards and any listing applicable to the quoted configuration. Component origin and lead time are also confirmed for each quotation.

LET'S BUILD SOMETHING

Start with
the details.

Tell us what you’re working on. The more you can share about your project, the better we can begin the conversation.

PROJECT INQUIRY

Request a quote

This form opens your default email application. Your inquiry is sent only when you send the email. You can also email us directly or call our team.

* Required fields

Request a quote