Panelboard Specifications

347/600-Volt Panelboards

A 347/600 V panelboard is generally applied to a three-phase, four-wire wye distribution system, where 600 V is the phase-to-phase voltage and 347 V is the phase-to-neutral voltage. That relationship affects the panelboard’s bus and neutral arrangement, branch-breaker selection, connected loads, and circuit schedule. We manufacture new equipment to project specifications and serve Texas from the United States. Confirm the intended system, equipment availability, utility requirements, and applicable standards during project review.

UL 891 switchboardsMADE IN USAFAST lead times
NEW EQUIPMENT. PROJECT FOCUSED.SERVING TEXAS
Electrical switchgear lineup in a workshop

NEW SWITCHGEAR FOR YOUR PROJECT

MANUFACTURING / EQUIPMENT / TEXAS

Define the 347/600 V system and intended loads

Begin the specification by identifying the source configuration, nominal voltage, frequency, grounding method, and available fault-current information. For the typical 347/600 V, three-phase, four-wire wye arrangement, 347 V loads connect phase to neutral, while 600 V loads connect phase to phase. Confirm that the project supply actually matches this arrangement; voltage notation alone does not establish the source, grounding, or permitted load connections.

List the loads served by the panelboard and distinguish their voltage and phase needs. Lighting and other single-phase loads may use phase-to-neutral connections, while three-phase equipment may require phase-to-phase or three-phase connections. Identify continuous loads, motor loads, and any loads with special starting or operating characteristics so the design review can assess bus, feeder, and branch-circuit requirements.

Choose the phase and neutral arrangement

For a four-wire wye system, specify a neutral arrangement appropriate to the connected loads and the project’s grounding design. State whether the neutral must be full-sized or otherwise engineered for the expected load, and identify any nonlinear loads that could affect neutral current. The neutral is a functional circuit conductor; its treatment and connection must follow the approved system design rather than assumptions based only on panel voltage.

Document the required number of phases and wires, neutral configuration, grounding provisions, and incoming conductor arrangement on the equipment schedule. Also clarify whether the panelboard is service equipment or a downstream distribution panel, since that distinction affects the specified main device and grounding and bonding details. The engineer of record should resolve coordination with the upstream source and applicable project requirements.

Verify branch-breaker voltage and pole requirements

Specify branch breakers for the actual circuit voltage and connection, not simply the panelboard’s highest stated voltage. A 347 V phase-to-neutral branch and a 600 V phase-to-phase branch have different connection requirements; the breaker’s voltage rating, pole count, interrupting rating, and compatibility with the panelboard must suit the circuit and available fault current. Confirm whether loads require single-pole, two-pole, or three-pole protection.

Provide breaker quantities and ratings from the coordinated load and protection design, including any required main device and spare positions. Do not assume a breaker family or rating is available for every proposed configuration. We review requested components and equipment details for each quotation, and the final selection should be checked against the panelboard design, system conditions, applicable standards, and project approval requirements.

Build a circuit schedule that supports coordination

A useful panel schedule identifies each circuit by load name, area or equipment tag, voltage, phase, pole count, breaker rating, and connected load. Record which circuits are 347 V line-to-neutral and which are 600 V line-to-line or three-phase. Include spare and future circuits clearly, and reconcile circuit identifiers with the electrical drawings, feeder schedule, and equipment connection documents before release.

For quotation and engineering review, provide the latest one-line diagram, panel schedule, load information, enclosure and installation requirements, and any project-specific standards. Note the required main arrangement, incoming cable or bus connection, and restrictions on dimensions or access. Complete documentation helps identify conflicts early, such as a schedule calling for a circuit voltage or breaker arrangement that does not match the stated system.

Plan phase loading and neutral demand

Distribute single-phase 347 V loads across the three phases using calculated demand and the project’s load assumptions. A circuit count alone does not demonstrate balance: loads can differ in size, duty cycle, and operating schedule. Review phase loading at relevant operating conditions, account for expected changes, and coordinate the panel schedule with upstream feeder capacity and the design’s diversity or demand methodology.

Evaluate neutral current as well as phase loading, particularly when the panel serves electronic lighting or other nonlinear loads. The appropriate neutral design depends on the actual load characteristics and applicable engineering criteria; it should not be inferred from a generic percentage or a typical panel configuration. Keep load calculations, phase assignments, and schedule revisions aligned so the design basis remains clear through procurement and installation.

Confirm availability, documentation, and new-equipment scope

U.S. equipment and utility compatibility must be confirmed for the specific project. Provide the serving utility’s published voltage and service characteristics, or other authoritative project documentation, and verify that the proposed 347/600 V arrangement is acceptable for the intended connection. Availability, engineering details, component origin, lead time, and test documentation are subject to review for each quotation; do not treat the nominal voltage as confirmation of any of these items.

We supply new panelboards and new retrofit components only, manufactured to specification. Identify whether the request is for a complete new panelboard or new components for a defined retrofit, and provide the existing equipment details when relevant. Confirm listing and applicable standards for the proposed configuration, along with submittal and documentation requirements. Installation, servicing, testing, and energization require qualified personnel following approved procedures.

LET'S BUILD SOMETHING

Start with
the details.

Tell us what you’re working on. The more you can share about your project, the better we can begin the conversation.