Define the 35 kV-Class Breaker Sections
Start the equipment scope with the one-line diagram and identify each required section by function: incoming source, feeder, bus tie, bus riser, metering, or another project-defined role. For every breaker section, provide the system configuration, source and load connections, breaker operating requirements, and any provisions for future sections. This makes it possible to review the lineup as an integrated arrangement rather than treating a 35 kV label as a complete design specification.
Clarify whether the request is for a new lineup or for new retrofit components intended for a particular existing lineup. For retrofit work, provide the existing manufacturer and equipment identification, drawings, photographs, breaker and cell details, and relevant nameplate information. Physical fit alone does not establish electrical or mechanical compatibility. We review the available information before confirming whether new components can be specified for the stated application.
Confirm Rated Maximum Voltage and Insulation
State the system nominal voltage and the required rated maximum voltage as separate design inputs. The applicable rating must suit the electrical system and its operating conditions; it should not be inferred from the phrase “35 kV class.” Provide the project’s insulation coordination requirements and identify any governing owner, utility, or engineering criteria. The quoted configuration and applicable standards should be reviewed against those requirements before equipment is released for manufacture.
Insulation selection also depends on how the assembly will be applied and on the project’s specified environmental and installation conditions. Share available information about the indoor or outdoor arrangement, altitude assumptions, ambient conditions, and any contamination or moisture concerns that affect the design basis. These inputs help the engineering review identify questions requiring resolution. Do not treat a general voltage-class description as confirmation of insulation performance for an unreviewed configuration.
Specify Short-Circuit Duty and System Conditions
Provide the available fault-current study or the project’s required short-circuit duty at the switchgear location. The review needs to distinguish the system fault level from the breaker’s required interrupting duty and the assembly’s applicable withstand requirements. Include the expected source configuration and relevant operating modes, such as normal and alternate feeds or bus-tie operation, because the fault conditions can vary with the system arrangement.
Identify the project basis for short-time withstand, peak withstand, and protection-clearing assumptions where applicable. If the fault study is preliminary, say so and provide its revision or the assumptions used. Do not select equipment from nominal voltage alone or rely on an assumed fault rating. Final suitability depends on review of the system study, configuration, and applicable requirements; availability and engineering are confirmed for each quotation.
Coordinate Relaying and Control Requirements
For each breaker section, describe the intended protection functions and the signals that must be exchanged with the broader system. Provide the protection study, relay requirements, control-power basis, trip and close logic, interlocking needs, and any required communications interfaces. Identify which functions belong in the switchgear scope and which are furnished elsewhere. Clear responsibility boundaries help avoid gaps between the lineup, protective devices, control system, and field wiring.
Submit available relay settings criteria and interface documents during quotation review, even if final settings will follow later. Note project requirements for metering, indication, alarms, remote operation, and point lists, and identify any owner-specific documentation format. Settings, coordination, and commissioning remain project-specific engineering tasks. Installation, servicing, testing, and energization must be performed by qualified personnel under approved procedures; equipment scope should not be mistaken for completed system coordination.
Plan the Compartment and Lineup Arrangement
Define the lineup sequence and the intended contents of each compartment, including breaker, bus, cable, instrument, and control spaces as applicable to the specified design. Provide room layout drawings, equipment access constraints, cable entry and exit preferences, and any required clearances or barriers identified by the project. These details affect section dimensions, interfaces, and maintainability. A one-line diagram should be accompanied by arrangement information sufficient to review the physical installation.
Identify whether the design requires provisions for future sections, special bus connections, segregation, or particular access and interlocking features. For an extension to existing gear, send interface drawings and confirm the existing bus and structural details rather than assuming a new section will mate with it. The final compartment arrangement is subject to engineering review. Applicable standards and any listing requirements should be verified for the specific configuration.
Build a Complete Quotation and Submittal Package
A useful request for pricing includes the one-line diagram, equipment schedule, fault-current information, protection requirements, room layout, cable details, and project specifications. Add the required quantity and section functions, delivery destination, requested project milestones, and any owner or consultant submittal requirements. Identify unresolved items instead of allowing assumptions to stand in for design criteria. We manufacture and supply new equipment; the requested scope and its documentation are reviewed before availability and lead time are confirmed.
If American components are required, state that preference in the specification and identify any applicable project documentation requirements. Component origin, engineering, lead time, and test documentation must be confirmed for the quoted configuration; no blanket domestic-content certification should be assumed. For a complete review, specify requested drawings, schedules, and documentation deliverables, and note which approvals are required before production. This gives purchasing, engineering, and construction teams a clear basis for evaluating the proposed new lineup.