Define the Two Sources and Bus-Tie Arrangement
A main-tie-main lineup has two source sections, each feeding its own bus, with a tie breaker linking the buses. Start the design conversation by identifying what supplies each main: utility services, transformers, generators, or another defined source. Clarify whether the sources are independent, whether either can carry the combined load, and what conditions permit the tie to connect them. These answers determine the equipment arrangement and operating limits.
Also document the intended load division, normal breaker positions, and any loads that must remain on a particular section. A tie may support transfer of selected or all bus loads, but that capability depends on source capacity, feeder arrangement, and the operating scheme. Provide one-line diagrams, source data, load schedules, and available fault-current information where available. We use these inputs to scope the new assembly rather than assume a standard configuration.
Choose Normal and Transfer Operating Modes
With the tie normally open, each source serves its own bus section, limiting routine connection between sources. If one source becomes unavailable, an approved operating sequence may open the affected main and close the tie to restore service from the other source. This arrangement requires confirmation that the remaining source and its upstream equipment can support the transferred load, including expected demand and any planned load shedding.
A normally closed tie presents different design questions because the sources may be electrically connected during ordinary operation. Determine whether parallel operation is permitted by the sources and their protective controls, and define what conditions initiate opening or transfer. For either mode, specify whether operation is manual, electrically controlled, or part of an automatic scheme. State the required sequence, permissives, alarms, and response to failure to operate.
Specify Interlocks and Operating Controls
Interlocks help prevent breaker combinations that conflict with the intended source arrangement. For example, a scheme may prohibit closing the tie until a source main is open, or may allow paralleling only when explicitly designed and authorized. Identify the permitted breaker states, the actions an operator may take, and whether mechanical, electrical, key, or control-logic interlocking is required. The final method must match the approved one-line and operating procedures.
Provide control-power requirements, control voltage, preferred local and remote functions, indication points, and any interface expectations for facility controls. Define how the lineup should indicate source availability, breaker position, transfer permissives, and alarms. Interlock and control details should be reviewed together: a control sequence cannot make an electrically unsuitable source combination safe. Installation, servicing, testing, and energization must be performed by qualified personnel under approved procedures.
Coordinate Protection Across Both Sources
Protection must account for each source feeding its own section and for the alternate source feeding loads through the tie. Ask the project engineer to evaluate fault-current contribution and protective-device coordination for normal and transferred conditions. A tie transfer can change current paths and available fault current, so settings or device selections appropriate in one lineup state may not provide the intended selectivity in another.
Share protection studies, source fault data, transformer information, device requirements, and any specified trip-unit or relay functions during quotation review. Identify whether the scheme requires protection changes, transfer blocking, or load shedding when one source carries both sections. We do not infer a coordination result from the main-tie-main label alone; the project documents and engineering review must establish device selections, settings, and applicable acceptance criteria.
Plan Maintenance Isolation and Access
Maintenance planning should identify how each main, the tie, and connected feeders are isolated, and what loads lose power under each isolation condition. Confirm whether the facility needs a path to keep one bus section energized while work proceeds on the other, and whether the remaining source can support the required loads. Equipment arrangement, barriers, access, and connection details should reflect the planned work boundaries and facility procedures.
Describe the required maintenance clearances, cable entry direction, termination space, working access, and any constraints from the electrical room or replacement route. For retrofit projects, distinguish the new switchgear assembly from new retrofit components intended to interface with existing equipment. Provide existing lineup drawings, nameplate data, connection details, and field-verified dimensions where available. Compatibility and scope must be reviewed before pricing; do not assume new components will fit or function with legacy equipment.
Prepare a Complete Specification and Quote Package
A useful request for pricing includes the one-line diagram, system voltage and frequency, source and load information, fault-current data, breaker and bus requirements, enclosure conditions, and the intended normal tie position. Include the transfer sequence, interlock narrative, controls, protection documents, metering, and communication requirements. Identify whether the scope is a complete new lineup or new retrofit components, and state required submittal documents and review milestones.
We build to specification using customer-specified American components, subject to project review. Component origin, engineering feasibility, applicable listing and standards, test documentation, and lead time must be confirmed for the quoted configuration; American-component selection does not establish independent domestic-content certification. UL 891 applies to switchboards, not every switchgear configuration, so verify the applicable standards and listing for the assembly. Request pricing with the project documents needed to evaluate the design.
