Switchgear Specification Checklist

A complete switchgear specification helps align engineering, purchasing, manufacturing, and installation before a quote is finalized. Use this checklist to identify the documents, ratings, operating conditions, protective devices, tests, and site details that define the equipment. We manufacture new equipment and new retrofit components to project specifications, serve customers across Texas from the United States, and ship nationwide. Configuration, components, documentation, and lead time are confirmed during project review.

UL 891 switchboardsMADE IN USAFAST lead times
NEW EQUIPMENT. PROJECT FOCUSED.SERVING TEXAS
Electrical switchgear cabinets arranged for a project

NEW SWITCHGEAR FOR YOUR PROJECT

MANUFACTURING / EQUIPMENT / TEXAS

Start with the one-line and applicable standards

Provide the current, project-specific one-line diagram and identify the equipment boundary: incoming source, mains, ties, feeders, metering, and downstream loads. Mark whether the request is for a complete new assembly or new retrofit components for existing equipment. Include revision date, source information, normal and alternate operating arrangements, and any interlocks that affect how the lineup must function.

Name the codes, standards, owner requirements, and authority having jurisdiction that apply, and identify the edition or project criteria where known. UL 891 is a standard for switchboard assemblies; it should not be treated as a blanket listing for every type of switchgear. Ask which standards apply to the proposed configuration, and have listing, labeling, and compliance details verified for that configuration during quotation and engineering review.

Define system and equipment ratings

State the system voltage, frequency, phase and wire arrangement, and the continuous current required for each main, tie, and feeder position. Identify the available fault current at the equipment and the source or study used to establish it. Specify required short-circuit and withstand ratings in the terms appropriate to the equipment, and provide protection or coordination study information when it governs device selection.

Clarify whether ratings must accommodate future load growth, spare positions, or a planned second source. Identify any rating constraints imposed by connected transformers, generators, utility service, or downstream equipment. Do not assume an existing nameplate value is suitable for a replacement or retrofit: provide clear photographs and nameplate data, and request an engineering review of compatibility and required ratings.

List devices, functions, and control requirements

Schedule each breaker or switching device by position, function, and required rating. Describe the protective functions and trip settings or adjustment ranges required by the design, and note any selective coordination, ground-fault protection, arc-energy reduction, or zone interlocking requirements. Identify metering needs, including measured quantities, accuracy expectations, communications, and whether instruments, sensors, or test provisions are part of the supply.

Document control power, trip and close circuits, remote operation, status contacts, alarms, and the intended interface with a building management, supervisory control, or protection system. State required protocols and signal lists if communications are included. For retrofit components, provide the existing equipment manufacturer, model, serial or catalog identifiers, compartment details, connection arrangement, and interface drawings; fit and functional compatibility require review rather than assumption.

Specify bus, construction, and environmental conditions

Describe bus requirements by section and position, including material preference, current-carrying needs, neutral and grounding arrangements, and any required bus links or transitions. Identify lineup arrangement, number of sections, cable or busway entry, termination orientation, and access needs. State whether provisions for future sections, spare spaces, barriers, or compartment separation are part of the design rather than leaving these details to interpretation.

Record the actual installation conditions: indoor or outdoor location, ambient temperature range, altitude, humidity, dust, moisture, corrosive exposure, vibration, and any enclosure or access constraints. Provide room dimensions, clearance limits, floor and anchorage information, and restrictions on shipping or equipment handling. Explain any unusual conditions or owner-specific construction requirements so engineering can determine their effect on the proposed configuration.

Set expectations for inspection, testing, and records

Specify the inspection and factory testing required by the project documents, and distinguish standard manufacturer checks from any witnessed, hold-point, or customer-specific tests. Identify the applicable test criteria, notification and scheduling needs, acceptance records, and who is authorized to witness. Testing scope and available documentation must be confirmed for the quoted configuration; do not assume a particular test, certification, or result is included without written confirmation.

Request the records needed for turnover, such as approved drawings, final drawings, device schedules, wiring information, operating instructions, and applicable test reports. State required formats, quantities, review milestones, naming conventions, and submission dates. If the project needs traceability for specified components or records for a commissioning plan, describe the requirement clearly so the manufacturer can confirm what can be supplied with the equipment.

Coordinate site interfaces and purchasing details

Confirm the physical and electrical interfaces before release: conduit and cable entry points, lug or termination requirements, control and communications connections, grounding provisions, and connections to existing gear or busway. Identify who supplies and installs field wiring, connectors, transition pieces, anchorage, and external protection. Include interface drawings and contact responsibility by discipline where multiple contractors or equipment suppliers are involved.

For a Texas project or another U.S. destination, provide the delivery location, receiving hours, access limitations, unloading responsibility, storage conditions, and required delivery sequence. State the requested ship window, drawing approval deadlines, procurement milestones, and any restrictions on substitutions or component origin. We supply new equipment and new retrofit components as the manufacturer; pricing, component availability, engineering, lead time, and shipping arrangements are confirmed for each reviewed request.

LET'S BUILD SOMETHING

Start with
the details.

Tell us what you’re working on. The more you can share about your project, the better we can begin the conversation.

PROJECT INQUIRY

Request a quote

This form opens your default email application. Your inquiry is sent only when you send the email. You can also email us directly or call our team.

* Required fields

Request a quote